Skip to content

Engine notes

engines/atom_fishbone_coupler/notes/ · assembled 2026-07-28 23:33 UTC.


Notes — Atom Fishbone Coupler

Engine-local notebook. Any new geometry, plot, or simulation gets an entry.

Date Entry
2026-07-28 Atom-accessible fishbone cavity campaign — active SiO₂ design, evidence gates, visual status, reproduction contract, and 25 FC ledger
2026-07-27 Unit-cell geometry and simulation log — includes 2D slot checks and the Stage 2 3D MPB result